Main Contractor: Willmott Dixon Construction
Client: Warwickshire County Council
A new build two storey Sixth form block was added to an existing site at Myton School in Warwick.
Steane carried out the M&E design from Stage 1 and installation ready for the September 2023 new term. The build consisted of twelve classrooms, Café and dining areas, ancillary areas including Washrooms and external car park lighting.
Some more detail
Our installation included for:
- General and Emergency lighting
- Lighting Controls
- External car park lighting
- Distribution and containment
- Access Control
- Data cabling
- Lightning protection
- Fire Alarm
- Disabled Alarms/Induction Loop
- Electric Panel Heaters
- Infrastructure for Teaching wall
- Networking back to existing School
- Classroom Mechanical Ventilation
- Above ground drainage
- VRF Heating and Cooling
- BMS Controls
- Sanitaryware
- Hot and Cold Water Supplies