Main Contractor: Seddon Construction
Client: Renaissance Villages
Steane has completed the M&E design and installation for Phase 1 of this prestigious over 60’s retirement village worth £36 million.
Set in beautiful countryside in Warwickshire there are 164 residences overall made up of luxurious 2 and 3 bed cottages and 1 and 2 bed apartments. All are centred around the Clubhouse with facilities such as Swimming Pool and Fitness Centre, Restaurant, Bar, Residents Lounges etc. Works are being carried out in three phases.
Some more detail
Our package consisted of:-
- Fully integrated M&E Design
- Hot and cold water supplies
- Heating
- Gas Services
- Boiler Room
- Ventilation
- Air Conditioning
- Above ground drainage
- BMS
- Distribution, trunking etc
- Lighting
- External Lighting
- Small Power
- Fire Alarm
- Smoke AOVS
- Electric Heating
- Access Control
- Warden Call
- Disabled Refuge
- TV Aerial
- Data